Skip to main content

Home Renovations hours: Mon to Sat, 8 am to 7 pm

5.0 out of 5.Rated 5.0 on Google

5.0 out of 5.Rated 5.0 on Google

Home renovations

Kitchen Renovations St. John’s NL

Kitchen renovations in St. John’s start from the plan: which layout the room can take and where the sink and the cooktop sit. Then comes how square new cabinets meet the walls and floors of an older house. A renovation has no starting price, so call or text to talk about the kitchen you have and arrange a visit for the quote.

  • Quote after a visit
  • Mon to Sat, 8 am to 7 pm
  • Call or text, no account needed

Book kitchen renovations and upgrades

No account needed. HomeBrill calls or texts you back about the project.

There is no starting price: your project is quoted after a visit to see it, and HomeBrill calls or texts you back to arrange that visit. Privacy: see the privacy policy. This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Kitchen renovations and upgrades in St. John's: long galley kitchen with white cabinets, a mosaic tile backsplash, under-cabinet lights and a stainless range Kitchen renovations and upgrades in St. John's: long galley kitchen with white cabinets, a mosaic tile backsplash, under-cabinet lights and a stainless range

Galley, L, U or island: what the room allows

Most of a kitchen layout is settled by the room before anyone looks at a cabinet. That means its width, the doors that cut into it, and where the window and the sink drain are.

  • Galley. Two runs of cabinets face each other. It suits a narrow room and one cook, if the aisle leaves space for an open dishwasher door with someone beside it.
  • L-shape. Two walls of cabinets, leaving the rest of the room open, often for a table.
  • U-shape. Three walls and the most counter, with two inside corners that need planning or they become storage nobody can reach.
  • Island or peninsula. Extra counter and seating, where the floor leaves room to walk around it.

Whatever the shape, the sink, the cooktop and the fridge should sit close enough to work between without anyone crossing a doorway. The sections on this page cover the decisions that follow, from cabinet boxes to countertops.

Old rooms downtown, open ones at the city’s edge

St. John’s has kitchens of every age. Often the kitchen is a long, narrow room at the back of an attached house, and its side walls are shared with the neighbours. Any window or duct has to go out the back wall or up through the roof. A galley like that usually stays a galley, and the gains come from deeper drawers, better light and a counter running the full length. Kenmount Terrace is one of the city’s newer subdivisions. A kitchen in a house of that age is more likely to open onto the living space, with room for an island.

The age of the house matters most when the sink moves. From 19th and early 20th century wooden row houses downtown, the city’s housing runs to post-war suburbs and recent subdivisions at its west and north edges. In an older house the kitchen drain may run to a cast-iron stack in a fixed place. A sink moved away from it needs a new drain with a steady slope and its own vent. That is plumbing alteration work for the plumbing service, and the City of St. John’s can say whether it needs a permit.

Square cabinets in a room that is not

New cabinets are square and level; the walls and floors of an older house seldom are, and much of the work goes into closing that gap:

  • Floors. Base cabinets are shimmed up to a level line taken from the highest point of the floor, so the counter is flat where the floor is not.
  • Walls. Where plaster bows, cabinet sides and filler strips are scribed, cut to follow the wall, instead of leaving a gap for caulk.
  • Fastening. Full upper cabinets are heavy, so they hang from screws into studs or into blocking added while the wall is open, never from plaster or drywall alone.

Old walls can hold hazards too. Health Canada warns that lead paint is likely in houses from before 1960, so test old trim, doors and painted cabinets before sanding. Knob-and-tube wiring, or a circuit too small for the new kitchen, is a licensed electrician’s to replace.

Asking about a kitchen in St. John’s

Renovations have no starting price, and in an older kitchen the walls and floor decide much of the cost, so the kitchen is quoted only once it has been seen. Call or text (709) 910-9100 with the room’s measurements, photos of each wall and roughly when the house was built. Arrange that visit in the same call or text. The renovation line takes calls and texts Monday to Saturday, 8:00 am to 7:00 pm, and the form at the top of this page reaches it too.

Putting the new range, fridge or dishwasher in place is a separate job, booked as appliance installation. The St. John’s bathroom renovations page deals with the other room that is often redone, and HomeBrill’s renovations page lists all twelve renovation jobs.

Problems and decisions

Start with how the kitchen is used

Kitchen renovations and upgrades, from new counters, a backsplash and better light to replaced cabinets and a layout that moves the sink or adds an island. To start, call or text (709) 910-9100 and describe the kitchen you have and the one you want.

A kitchen renovation can be new hardware, counters and paint, or a room taken back to the studs. Deciding which starts with how the kitchen fails you now. There may be too little counter beside the stove, a corner cabinet nobody can reach, a sink under a dark wall, nowhere to put the groceries down.

Measure before you plan. Note the walls, the window, where the sink drain and the range are, and which wall is an outside wall, because a vented hood needs one. Keeping the sink, the range and the fridge where they are keeps plumbing and wiring as they are, which holds the cost down. Moving them is where a kitchen project grows.

The list below sets out the decisions and problems that come up most, and the materials involved.

What you notice or decide, and what drives it

Too little counter, or a cramped corner
How the work zones sit: cooking, washing and storage, and the space between them. An island or a peninsula needs room to walk on every side.
Doors sagging, or boxes swollen under the sink
Worn hinges, and particleboard that swelled after a leak. Sound boxes can take new doors; swollen ones are replaced.
Choosing a countertop
How hard the kitchen is used, heat, knives and upkeep: some stone needs sealing, wood needs oiling, laminate will not take a hot pan.
Moving the sink
A drain and vent route through the floor or the wall. It is plumbing alteration work, with the permit question that comes with it.
Cooking smells and grease that linger
A hood that recirculates instead of venting, or a duct too small or too long. A vented hood needs a route to an outside wall or the roof, which shapes where the cooktop can go.
Dark counters
One ceiling light behind the cook. Under-cabinet lights and pendants are planned with an electrician before walls and backsplash are finished.
Outlets set too deep behind a new backsplash
Tile or panels thicken the wall, so the boxes need extenders. Kitchen counter outlets also follow circuit and protection rules of their own.
Old flooring layers under the cabinets
Kitchens were often refloored over the old floor. In houses built before about 1990, old sheet vinyl, tiles and adhesive may contain asbestos and are tested before removal.

Materials involved

  • Cabinet boxes Plywood holds screws and stands up to water better; particleboard costs less.
  • Hinges and drawer slides Soft-close hinges and full-extension slides that reach the back of a deep drawer.
  • Laminate countertop The least costly top; a burn or a chipped edge lets water swell the core.
  • Quartz Engineered stone that resists stains and needs no sealing.
  • Granite and other natural stone Hard and heat-tolerant; most need sealing from time to time.
  • Solid surface and butcher block Solid surface can be sanded and repaired; a wood top needs regular oiling.
  • Backsplash tile or panels Protect the wall between counter and upper cabinets.
  • Fillers and end panels Close the gaps where standard cabinet sizes meet a wall that is not square.
  • Under-cabinet lighting LED strips or pucks, wired before the backsplash goes on.

Pricing

What a kitchen renovation costs

A kitchen has no starting price; the HomeBrill team quotes it after a visit to see the room. Call or text with the size of the kitchen, photos of each wall and a list of what you want changed, then arrange that visit.

Cabinets and counters are usually the largest part. Stock, semi-custom or custom cabinets, and laminate, quartz or stone tops, can change a budget more than anything else. Moving the sink or the cooktop adds plumbing, wiring and venting. A new floor, extra lighting, a backsplash and what the old walls and floor turn up add the rest.

Starting price
None: quote after a visit
Your project
Call or text to describe it and arrange the visit; the quote comes after it

kitchen renovations and upgrades

The order of a kitchen renovation

Most kitchens follow the same sequence, and knowing it helps you plan the time without a working kitchen.

  1. Clear out and protect the rest of the house from dust. If the house was built before about 1990, have old flooring layers and any suspect joint compound tested for asbestos before demolition. Health Canada advises not disturbing material that may contain it until it has been tested.
  2. Demolition, then the rough-ins while walls are open: drain and supply lines, new circuits and outlets, the hood duct. Anything electrical beyond a like-for-like swap belongs to a licensed electrician, and any propane line to a qualified gas technician.
  3. Drywall repairs, then the floor, if it is to run under the cabinets.
  4. Base cabinets set level and fastened, then upper cabinets.
  5. Countertops: laminate can go on at once; stone is templated on the installed cabinets and fitted later.
  6. Sink, faucet and backsplash, then lighting, hardware and paint.

Appliances, plumbing and the other trades

The appliances are a job of their own. Putting a new range, fridge or dishwasher into the finished kitchen is appliance installation, and an appliance that is not working is a job for appliance repair. A new sink and faucet are plumbing fixtures: faucet and sink installation covers them. Permits for layout changes come from your city or town. The home renovations page lists the other renovation projects.

Service areas

Kitchen renovations are booked in St. John’s, Mount Pearl, Paradise, Conception Bay South, Torbay and the Goulds, all on the HomeBrill service areas page. Wherever the house is, start with how the kitchen is used.

FAQ

Kitchen layout questions from St. John’s

Is a galley kitchen worth keeping, or should it become an L?

Keep it if one person does most of the cooking, since a galley puts everything within a step or two. An L means giving up one run of cabinets or opening an end wall, which pays off only where there is then room for a table or a second cook. Before an end wall comes out, find out whether it carries load: interior remodelling in St. John’s explains how a wall is checked.

Do plaster walls have to come down before new kitchen cabinets go up?

Not always. Sound plaster can stay, with the cabinets screwed through it into the studs and shimmed where the wall bows. Taking it down makes sense where the wall must open anyway for new wiring or a moved drain, or where the plaster is loose. Test the paint for lead before any of it is broken out.

How do new cabinets end up level on a kitchen floor that slopes?

The installer finds the highest point of the floor, marks a level line around the walls from there. Every base cabinet is shimmed up to it, so the countertop is flat though the floor is not. The toe kick hides the shims. A floor that falls steeply across the room deserves a look from the basement first.

Where does a kitchen need clear counter beside the sink and the cooktop?

On both sides of each, with the longest stretch between the sink and the cooktop, where the chopping happens. Kitchen design guides also ask for counter beside the fridge’s handle. In a narrow kitchen, put a tall cabinet or the fridge at the end of a run, not between two work areas.

When does a stone countertop get measured?

Once the base cabinets are installed, levelled and fastened. The fabricator makes a template of the tops at that point, so the cabinets must not move afterwards. Choose the sink and faucet by then, because their cut-outs are part of the template.

Which countertop material stands up to a busy kitchen?

Quartz resists stains and never needs sealing. Granite is very hard and copes with heat, but needs sealing now and then. Laminate costs least but marks under hot pans and knives, and butcher block needs regular oiling and care around the sink.

Can a kitchen island have a sink of its own?

Yes, with a drain run through the floor below and a way to vent it, often an air admittance valve where the plumbing code allows one. A basement under the kitchen makes the drain much simpler. Moving a sink is plumbing alteration work, so check with your city or town whether it needs a permit.

Does new kitchen flooring go under the cabinets or stop at them?

Either can work. Running it under the cabinets uses more material but lets the layout change later without a gap in the floor; stopping at them saves material and fixes the layout. Floating floors usually stop at the cabinets, because their weight would pin the floor in place.

Book kitchen renovations and upgrades in St. John’s

Call, text or send the form, Mon to Sat, 8:00 am to 7:00 pm.